Uncategorized

TCCD 2019 Bond Program

Posted on

In November 2019, Tarrant County voters approved TCC’s $825 million bond proposal to fund a plan that will construct, improve, renovate and equip buildings throughout the six-campus district. An additional $12 million will be added to the NW Campus redevelopment to support the Early College High School program. CARCON Industries serves as a subconsultant for […]

Uncategorized

Carl R. Darnall Army Medical Center

Posted on

The Carl R. Darnall Army Medical Center Replacement Hospital project at Fort Hood, Texas replaced an existing 45-year old medical center and provides a new state-of-the-art healthcare facility for our service members and their families. The project consists of an acute care hospital and outpatient clinic, central utility plant, an ambulance parking garage and three […]

Uncategorized

UNT Dallas Campus – Multipurpose Building & Phase I Infrastructure

Posted on

The new 75,000-square-foot academic and administrative building, with its panoramic views of the downtown Dallas skyline, will provide classrooms, meeting rooms and office space and serve as a gathering place for students until the next phases of campus development are completed. Location: Dallas, TX Client: University of North Texas Team: Hunt/Dikita/CARCON Joint Venture Project Role: […]

Uncategorized

Denton County Transit Authority (DCTA) A-Track

Posted on

As a subcontractor to North Texas Rail Group, CARCON provided engineering services, traffic control and MWBE outreach, monitoring and reporting. The A-train is a 21-mile commuter rail line starting in Denton TX that parallels I-35E and is the connection to the Dallas Area Rapid Transit (DART) Trinity Mills Station in Carrollton TX. Location: Denton, TX Client: […]

Uncategorized

DART Green Line Project

Posted on

CARCON Industries was a member of the Archer Western, Brunson and CARCON Joint Venture (AWBC). As a JV partner CARCON provided construction management, quality control, traffic control and station superintendents throughout the project. As a subcontractor to the JV, CARCON also provided paving, curbs and gutters, equipment pads, light pole bases, ramps and sidewalks. Location: […]

Uncategorized

Other Projects

Posted on

Carl R. Darnall Army Medical Center Replacement Location: Fort Hood, TX Client: U.S. Army Corps of Engineers – Fort Worth District Prime Contractor: Balfour Beatty/McCarthy Joint Venture Project Role: Subcontractor Type of Project: Healthcare / U.S. Army Corps of Engineers Completion Date: 2015 The Carl R. Darnall Army Medical Center Replacement Hospital project at Fort […]

Uncategorized

City of Dallas Modern Streetcar Phase II

Posted on

The Colorado/Beckley to Zang/Davis Extension (South Extension) project consists of approximately 0.75 miles of double track streetcar construction extending from the existing Colorado/Beckley stop along Beckley Avenue and Zang Boulevard to its termination at West 7th Street. This project reconfigures the existing Colorado/Beckley Stop to allow for extension of the existing streetcar line, and includes […]

Uncategorized

City of Dallas Modern Streetcar Phase I

Posted on

Joint Venture Construction Management Team of Stacey Whitbeck/CARCON built Phase I extension of the Dallas Modern Streetcar. As a JV partner, CARCON provided construction management staff, document control, safety, quality control management and SWPPP. Stacey Whitbeck/CARCON Team hired and managed 29 subcontractors. The Streetcar is approximately 2.3 miles in length starting at downtown Dallas Union […]

Uncategorized

TCCD South Campus Center of Excellence for Energy Technology – LEED Platinum

Posted on

The 87,000 square-foot facility, the largest of its kind in the nation, showcases forward-thinking technologies and concepts to maximize energy conservation and learning experiences, including the use of exposed building components to be used as teaching tools. The space includes a 600-person lecture hall and a common space for shared learning opportunities across multiple disciplines […]